China News Network February 14 network news, according to the Chinese Government, the Audit Commission issued some 10 provinces and municipalities in the airport building audit findings, reads as follows:
10 provinces and municipalities in part of the airport building audit findings
(February 14, 2011 announcement)
under and municipalities (hereinafter referred to as the 10 provinces and cities), construction of the airport conducted an audit of investigations, focusing on survey of 31 airports. Audit findings are hereby announced as follows:
First, the basic situation and the Audit and Evaluation
billion, the accumulated investment 30.573 billion yuan, accounting for 91% of the 53 airports and 94.4%.
audit findings indicate that the , construction and operation have achieved some success:
First, the airport layout
gradual improvement of transport capacity greatly improved. , 23 of them in operation by the renovation and expansion of the airport after 2009, passenger throughput reached 59.4 million passengers, up 28% over 2008. Kanas in Xinjiang in particular, Inner Mongolia Erenhot, MOHE, Tengchong, Yunnan, Sichuan, Kangding, Baise, Guangxi and Fujian Sanming and other , also makes the overall layout of the gradual improvement of the airport.
second airport to some extent driven by local regional economic development and improve local investment environment. As of the end of 2009, the Central has invested 3.745 billion yuan of special funds to expand domestic demand for airport construction grants 25, the accumulated investment 23.743 billion yuan, 5.898 billion yuan boost local investment and create 59,061 jobs, effectively promote the local regional economy steady and rapid development. Meanwhile, the airport construction to improve the local investment environment, promote development of tourism related industries also play an important role.
Second, the audit found that the main problems and rectification
(a) of Fuzhou, Quanzhou, Guilin, Erenhot and 5 airports to Manchuria so long to declare, repeated application, etc. more than 061 million yuan for construction funds for the airport the other project expenditures; Daqing, Yulin, Urumqi and Chengdu 4 airports of the material suppliers in order to evade taxes, and construction units in the settlement of the use of false invoices, involving an amount of 033 million yuan; Chengdu airport construction unit will be subcontracted earthwork 13 individuals, the latter in order to evade taxes, in connection with construction unit provides 223 settlement
audit noted that the above problems, the local government instructed the relevant departments to take effective measures and timely correction: multi-access of construction funds for the departments concerned are working on corrective measures. For the use of false invoices and processing units in the inventory.
(b) of the 23 airport projects of 359 contracts (total contract sampling 19.7% of the total number of 1817), there is no public bidding and other violations of the bidding procedure, involving an amount of 1.938 billion yuan.
audit noted that the above problems, the local government is further verification by law, will verify the results, the responsible persons shall be held responsible, and strengthen the construction of the airport project supervision, supervision of construction units such as strict implementation of the Bidding Law regulations.
(c) Saertu airport flight zone in Daqing Field Road project tender the construction contract entered into illegal price than in (1.26 billion) more than twice, project bidding and investment control a mere formality.
audit noted the problem, relevant departments are settled in Daqing Saertu the airport to conduct a comprehensive review and verify project cost, and further processed according to verify the situation.
(d) 5 airports in the environmental impact assessment report on the case without the approval to start construction; 15 airports in the acceptance of environmental protection have not been the case to put into operation; 7 projects fail the original construction of the sewage treatment system design requirements, some airports have the sewage directly into the river or farmland, there is pollution risks.
audit noted that the above problems, the Chinese Civil Aviation Authority is working with the Ministry of Environmental Protection, in consultation study and improve the supervision mechanism of the airport environment, and strengthen the environmental monitoring of airport construction projects, urging acceptance of the airport have not been timely environmental organizations acceptance; related Local governments are instructed to take the units supporting the construction of pipe network and sewage treatment stations and other measures to address the sewage problem.